Production Intelligence

Select a dashboard to view performance metrics

OTC Production Dashboard

On-Time Completion tracking across all manufacturing workstations. View completion rates, late operations, and workstation performance trends.

5,630 OTC Records
10 Workstations
Jan 2023+ Data Range

Customer Supplied Equipment

Live view of customer-supplied component ETAs vs PSD. Flags projects getting moved out (missing ETA inside 75 days, or an ETA that lands on/after PSD), plus 75-90 day and 90+ day no-ETA watch lists. Filter by salesperson; click any row for full component detail.

Moving Out Either Rule
No ETA 75-90 / 90+ Days
Live From Monday.com

Engineering Release Dashboard

Engineering timeline vs PSD analysis. Track on-time release rates, engineer performance breakdowns, equipment type analysis, and days moved out trends.

On-Time % Completion
By Engineer Breakdown
Equipment Type Analysis

Routing Tracker

Track how long it takes to route projects after engineering release. Analyze routing speed, fabrication lead time before Pre-fab Goal, and release date accuracy.

Routing Time 1-5+ Days
Fab Lead Before PSD-7
2024-2026 Data Range

Schedule Optimization KPIs

Historical $/hr analysis by department (Weld, Paint, Assembly, Blast) trended over time. Product mix analysis comparing Conveyors vs Plants by revenue efficiency.

$/hr By Department
Product Mix Hours vs Rev
2022-2026 Data Range